Photo: by Douglas Hill Photography of a closet designed by Lisa Adams, LA Closet Design
(image via LA Closet Design on HOUZZ)
After some thankfully not long-lasting jackhammering, floor sawing and digging in the basement, we have the first step in the process done, whew! The plumbing rough-in is done, as well as a few other plumbing discoveries that we found after the concrete was up that needed repaired, and the drain tiles and sump pump go in any day now. That will be a nice load off our shoulders to be finished with that and ready to move on the remaining construction down there, and hopefully not be bleeding money too much longer.
